Other Projects:

[Home] [Boesch-Kingery/Lan Park]   [Main Street/Stockton Avenue Rehab]   [S. Frontage Road, Phase 2]


 

Main Street and Stockton Avenue Rehabilitation

 

 [map]  (use the "Back" button in your browser to return to this page)
[photos]


Contractor: Ross F. Carroll Inc.


This project will add extensive streetscape beautification and repair the asphalt at some of the most traveled roadways in Ripon. The City of Ripon has been awarded $3.5 million to construct this project. To receive this grant, the construction contract must be awarded by December 6, 2007. The project includes improvements to the following:

Main Street from Wilma Ave to Acacia Ave [click to see renderings]
This section of Main Street will include replacing the asphalt concrete with pavers, new curb, gutter, and sidewalk (where needed), extensive streetscape beautification including new planter area, landscaping, and decorative lighting.

Stockton Ave from Main Street to Second Ave [click to see renderings]
Similar to the Main Street section of the project, the asphalt concrete will be replaced with pavers, new curb, gutter and sidewalk will be replaced where needed, extensive streetscape beautification including new planter area, landscaping, and decorative lighting.


Wilma Avenue from Main Street to Second Ave
The asphalt concrete has failed in this section of roadway. As part of this project, the existing asphalt concrete will be removed and replaced.

Update (04/28/2008): The first phase of the project is currently underway. This phase consists of the removal and replacement of the curb, gutter and sidewalk. The asphalt on the south side of Main St. has been removed. Removal of the curb, gutter and sidewalk on the south side of Main St. is complete. Construction of the new curb, gutter and sidewalk on the south side of Main St. is underway and will continue into the next couple of weeks. Most of the storms drain pipe and manholes have been installed. The new water main line installation is complete and the contractor will be making the service connections this week.

 

Wilma Avenue construction will begin on April 28, 2008

Due to construction work, Wilma Avenue between Main Street and Fourth Street, will be closed. The road closure will begin Monday, April 28 and continue through approximately three weeks. The intersection of Wilma Avenue and Fourth Street may be closed for a time, but we will endeavor to keep it open as much as possible. Emergency access, as well as business and resident access along Wilma Avenue will remain available at all times. Pedestrians please use the north side of Main Street.


 

[Main Street Schedule]

For questions about this project please contact Barbara Schneider at (209) 599-2108 or by email at bschneider@cityofripon.org.

 

 

Move your curser over the small image to enlarge the picture.